Residual Stress Analysis
analysis is beginning ....
Filling phase: Status: V = Velocity control
P = Pressure control
V/P= Velocity/pressure switch-over
|----------------------------------------------------------------------|
| Time | Volume| Pressure | Clamp force|Flow rate|Ram Pos.| Status|
| (s) | (%) | (MPa) | (tonne) |(cm^3/s) | (mm) | |
|----------------------------------------------------------------------|
| 0.10 | 58.91 | 60.11 | 5.07 | 102.33 | 7.63 | V |
| 0.15 | 92.30 | WARNING: The specified flow rate exceeds the
maximum machine injection rate, using maximum machine injection rate|
| 0.15 | 92.30 | 75.57 | 10.52 | 108.75 | 5.00 |V/P by ram pos.|
| 0.16 |100.00 | 60.45 | 11.55 | 38.59 | |Filled |
|----------------------------------------------------------------------|
Filling phase results summary :
Maximum injection pressure (at 0.147 s) = 75.5678 MPa
End of filling phase results summary :
Time at the end of filling = 0.1626 s
Total weight = 13.7057 g
Maximum Clamp force - during filling = 11.5500 tonne
提示超出了机器的最大注射率该怎么办?filling control 是由Ram speed profile 控制的