当是"作业", 试了一下, 感觉不太通顺, 请真正的高手指正:
To quote moulds per Autosystems mould build standards release 18.
Attached for your reference.
按照全自动模标准第18项做 . 附档供您参考
- Mould flow, cool & warp analysis to be supplied by you.
请提供模流分析,冷却及翘曲分析报告
- End of arm tooling for each mould.每套模配备吊臂
- Quick mould change spigot system and supply 4+4 spigots.提供4+4快速运水接头
- All Moulds with standard engraving.所有模具按标准咬花蚀纹;
- Water cooling with steel braided lines and CITO manifold for each half of mould
前后模冷却水组和CITO分流板
- All Moulds must have certified lifting bracket.
所有模必须证明 ?承托支架?
- Include 1 first shot tryout, 3 - 500 shots tryouts and 1- 8 hour run tryout for all the moulds..
所有模具需分别包括1模/3-500模和1至8小时试模验证OK
- Include final shipment of all moulds, end of arm tooling and all above
所有模均包括最后走模,和吊臂以及以后所有. |