找回密码 注册 QQ登录
一站式解决方案

iCAx开思网

CAD/CAM/CAE/设计/模具 高清视频【积分说明】如何快速获得积分?快速3D打印 手板模型CNC加工服务在线3D打印服务,上传模型,自动报价
12
返回列表 发新帖
打印 上一主题 下一主题

[求助] 哪位高手能帮小弟把下面几句话翻译成中文?感激不尽(问题已决解,哪位斑大帮帮忙移分吧)

[复制链接]
11
发表于 2007-7-6 21:28:26 | 只看该作者
原帖由 slflkj 于 2007-7-6 14:08 发表
首先申明我不是高手.如有错误,请指正!

1.Correct ‘snatching’ should be incorporated to ensure that parts stay on correct half of

tool consistently during a production run.
1.模具在生产过程中 ...

想必slflkj兄的内功相当深厚啊!!高人+内功+热情=答案=感激不尽!
12
发表于 2007-7-7 16:43:46 | 只看该作者
原帖由 slflkj 于 2007-7-6 14:08 发表
首先申明我不是高手.如有错误,请指正!

1.Correct ‘snatching’ should be incorporated to ensure that parts stay on correct half of

tool consistently during a production run.
1.模具在生产过程中 ...


这个应该是比较通顺的
~~~~~
13
发表于 2007-7-9 13:56:49 | 只看该作者
原帖由 slflkj 于 2007-7-6 14:08 发表
首先申明我不是高手.如有错误,请指正!

1.Correct ‘snatching’ should be incorporated to ensure that parts stay on correct half of

tool consistently during a production run.
1.模具在生产过程中 ...


唉,上头推的要命,可还有几句,用脚去想都是想不出来的,再请slflkj 出马帮帮忙啊!为了表示我的诚意,我愿意用我仅有的1分技作筹码!到时劳烦斑大帮帮忙了!
5.Bushings and/or ball cage bearings should be designed to remain captive during the forward and reverse ejection strokes.
6.16 way 16amp Harting plugs for the thermocouples, with the male side on the tool.
7.From 1 to 8 heaters      -      use 1 set of plugs
8.From 8 to 16 heaters    -      use 2 sets of plugs.
9.Hot-runner tools to be supplied fully wired. Ready to plug directly into Chilton  power supply. Plugs to be fully secured to the top of tools.
10.Component and sprue should be dissimilar where possible to facilitate automatic sorting.
11.Cavities - where there are multiple cavities: these should be balanced correctly and numbered.

也麻烦帮我看看我翻译的几句:
12.Core pull cylinders to be hydraulic.
用水压来运行抽芯油缸.
13.For machines between 22 tonnes and 50 tonnes inclusive, ejector bars are to be fitted with ejector springs, which can be either on the ejector bar or on push-back pads. All tools for machines of 60 tonnes and over must have a clearance hole for a central ejector bar of 40mm diameter where possible, and a threaded hole of either 16mm or 20mm in the ejector plate to facilitate connection of the central ejector bar to the ejector plate.  (See sketch “Ejection Standard” attached).  Ref: Fig 3.
对于包括22T和50T或其之间的啤机,顶杆上是带有脱模弹弓的,弹弓可能装在顶杆上或者在限位块上.所有使用60T和60T以上的啤机的模具,必须要做一个直径为40MM的顶杆孔,并且要在顶针板上攻一个M16或M20的螺牙与顶杆相配.
14.Parts designed to eject into bin during automatic run must eject consistently.
把模具设计为在自动运行期间,产品被连续顶出,落入一个箱子里.
15.Ejector guide pillars to have oil grooves.
导柱处加油坑.
16.If possible, build tools so that they will sit on their own base when separated without the need for extra supports.
增加模脚使模具在分开时,模脚可独立支撑模体.
14
发表于 2007-7-9 19:43:43 | 只看该作者
献丑了!!

5.Bushings and/or ball cage bearings should be designed to remain captive during the

forward and reverse ejection strokes.
在前后受力下,轴承的内外圈和保持架应保持固定不动。
6.16 way 16amp Harting plugs for the thermocouples, with the male side on the tool.
6.在模具公模侧为热电偶(即温度传感器)安装16芯16安热流道插座。
7.From 1 to 8 heaters      -      use 1 set of plugs
7.从1到8点用插座的第一组。
8.From 8 to 16 heaters    -      use 2 sets of plugs.
8.从8到16点用插座的第二组
9.Hot-runner tools to be supplied fully wired. Ready to plug directly into Chilton  power

supply. Plugs to be fully secured to the top of tools.
热流道模具提供所有的连接线。插头接好连线,可以直接插到电源上使用。插座全部可靠地安装在模具

顶部。
10.Component and sprue should be dissimilar where possible to facilitate automatic sorting.
10.产品和浇口应尽可能自动分开。
11.Cavities - where there are multiple cavities: these should be balanced correctly and

numbered.
11.一模多穴的模具,各个型腔的进胶应平衡,并做好穴号。

也麻烦帮我看看我翻译的几句:
12.Core pull cylinders to be hydraulic.
12.用液压油缸来抽芯。
13.For machines between 22 tonnes and 50 tonnes inclusive, ejector bars are to be fitted

with ejector springs, which can be either on the ejector bar or on push-back pads. All

tools for machines of 60 tonnes and over must have a clearance hole for a central ejector

bar of 40mm diameter where possible, and a threaded hole of either 16mm or 20mm in the

ejector plate to facilitate connection of the central ejector bar to the ejector plate.  
13.在22吨和50吨之间(包括20吨和50吨)的注塑机上生产的模具,需在复位杆或复位垫板(顶针底板)
上装复位弹簧。所有60吨及60吨以上的,需在底板中间加工一40mm的避空孔,并在顶针板上加工一个M20

或M16的螺纹孔,用来连接顶棍和顶针板。
14.Parts designed to eject into bin during automatic run must eject consistently.
14.模具在注塑时,采用全自动。

15.Ejector guide pillars to have oil grooves.
导柱加油槽.
16.If possible, build tools so that they will sit on their own base when separated without

the need for extra supports.
如果有必要,模具应增加模脚,使模具在分开时可以独立放置.
15
发表于 2007-7-10 09:12:48 | 只看该作者
原帖由 slflkj 于 2007-7-9 19:43 发表
献丑了!!

5.Bushings and/or ball cage bearings should be designed to remain captive during the

forward and reverse ejection strokes.
在前后受力下,轴承的内外圈和保持架应保持固定不动。
6.16  ...

答案合理,满意!太感谢slflkj兄了!1该是回报slflkj兄的时候了!哪位斑大有空帮忙把我的1分技术分转移到slflkj兄的账上??劳烦斑大了!
16
发表于 2007-7-11 08:20:42 | 只看该作者
哪位斑大帮帮忙吧!!要不我可要食言了!!
17
发表于 2007-7-12 08:39:45 | 只看该作者
怎么没人理?我顶上去!!
18
发表于 2008-3-18 16:54:12 | 只看该作者
英语翻译,要求信、达、雅,我认为这位兄弟翻译的过简,确实模具专业的英语是不那么好翻译。希望合兄弟学学习交流。
您需要登录后才可以回帖 登录 | 注册

本版积分规则

3D打印手板模型快速制作服务,在线报价下单!

QQ 咨询|手机版|联系我们|iCAx开思网  

GMT+8, 2025-2-24 07:23 , Processed in 0.077513 second(s), 9 queries , Gzip On, Redis On.

Powered by Discuz! X3.3

© 2002-2025 www.iCAx.org

快速回复 返回顶部 返回列表